**NOTE: Projects performed and assembled by Navarro Artero, S.L. as a contractor or subcontractor for the installation of piping systems, accessories and mechanical equipments.
Drinking Water Supply | Productivity Capacity (No Habitants) |
---|---|
Drinking water supply in Minera Peñasquito (México)-76.806 ml HDPE pipe Ø6”-36”, PN 6 up to PN 25 | |
Drinking water supply in Urbanización Playa Blanca (Lanzarote-Spain) | 300 |
Drinking water supply in La Ciudad de la Luz (Alicante-Spain) | 10.000 |
Drinking water supply in Los Asperos (Murcia-Spain) | 15.000 |
Drinking water supply inUrbanización Campo de Golf Pinar del Campo Verde (Alicante-Spain) | 250 |
Drinking water supply in Sector R-8 Pilar de la Horadada (Alicante-Spain) | 23.400 |
Drinking water supply in Carretera de Abanilla-Santomera (Murcia-Spain) | 10.594 |